Link

Social

Embed

Disable autoplay on embedded content?

Download

Download
Download Transcript

[00:00:05]

OPERATIONS COMMITTEE ON AUGUST 12TH WATER FIRST ITEM IS APPROVAL OF THE AGENDA IS JUST YOU AND ME SO FAR I THINK JOHN IN THAT CASE A MOVE THAT WE APPROVED THE AGENDA.

>> ALL RIGHT. I'LL SECOND THAT I'M PASSING THE GAVEL TO SO I COULD SECOND IT ALL. OH, I CAUGHT IT ALL IN FAVOR OF I I OK 2 0 PLEDGE OF ALLEGIANCE OR NEXT TASK IF EVERYONE COULD STAND FOR THAT I PLEDGE ALLEGIANCE TO THE FLAG STATES AIR AMERICA WITH RICHARD SPENCER STAND AND ONE NATION NATION GOD INDIVISIBLE WITH

LIBERTY AND JUSTICE FOR ALL. >> THANK YOU. WE HAVE NO PUBLIC COMMENTS SO

[Approval of the Committee Meeting Minutes]

THE NEXT ITEM IS APPROVAL OF THE MEETING MINUTES FROM JULY THE 8TH TRYING TO GET HIM

LOADED OKATIE. >> LET ME KEEP STERLING. YEAH PLEASE.

>> ARE YOU GOOD JOHN? YEP. MOVE WE APPROVED THE MINUTES AN AWESOME FAVOR BY 2 0. SMITH NOT PRESENT. THE NEXT IS THE APPROVAL OF AUGUST 5TH. MINUTES OKAY. THAT WAS THE SPECIAL CALLED MEETING IN VERY VERY SHORT MINUTES. NO ACTION.

SEE NO MOVIE APPROVED THE 5 AUGUST MINUTES SECOND. ALL THOSE IN FAVOR.

ALL RIGHT. TO ZERO INTEREST NOT PRESENT. AND THAT MOVES US TO THE

[Construction Update]

CONSTRUCTION OF SO I GUESS THAT'S YOUR SHOW ROB. WELL, THANK YOU VERY MUCH.

I HOPE EVERYBODY'S DOING WELL THIS AFTERNOON AS ROBIN PULLS THIS INFORMATION UP.

I KNOW THAT DUE TO THE LOGISTICS WE PROBABLY WILL GO THROUGH ALL OF THE CONSTRUCTION VIDEO UPDATES FIRST AND THEN DOVE INTO THE POWER POINTS. ROBIN GETS THAT ONE PULLED UP.

WE'LL START DRIVING THIS UPDATE FORWARD FOR EVERYBODY. GIVE ME A SECOND AND THEN I

WILL GET IT. SHARE IT. >> TAKE THE SOUND OFF.

YES, PLEASE. LET ME START AGAIN. I HAVE TO SHARE THE SCREEN.

YEP. AS ROB WAS PULLING THAT UP I THINK WE HAVE FOUR VERY SHORT CLIPS TO SHOW THE PROGRESS FOR MY RIVER HIGH SCHOOL. WE'LL GO AHEAD AND BEGIN WITH

THOSE VIDEO THOSE ONE SHARE. >> THERE WE GO. THAT'S FIRST VIDEO FOR ME.

RIVER HIGH SCHOOL IS OF THE EAST ELEVATION. YOU'LL SEE THAT THE BLOCK WORK

[00:05:01]

HAS BEEN COMPLETED AND WHAT YOU SEE IT ON THE EXTERIOR WALL SECTION THERE IS THE APPLICATION OF THE EXTERIOR INSULATION. THE NEXT VIDEO WILL BE OF THE WEST ELEVATION AND YOU'LL SEE THAT THE EXTERIOR WALL INSULATION HAS BEEN COMPLETED ON THIS ELEVATION AND THERE AT THE BOTTOM YOU CAN SEE THAT THEY'VE BEGUN COMMENCING THE

INSTALLATION OF THE EXTERIOR FACE BARACK. >> THE NEXT VIDEO IS A TYPICAL CLASSROOM ON THE FIRST FLOOR SHOWING THE PROGRESS THAT'S BEING MADE WITH THE PLUMBING MECHANICAL ALL ELECTRICAL AND FIRE SPRINKLER RUFFIN OF THOSE SYSTEMS. THE LAST VIDEO IS OF A OUR CLASSROOM THAT'S ALSO ON THE FIRST FLOOR THAT ONCE AGAIN IS REFLECTING THE PROGRESS OF THE MECHANICAL ELECTRICAL PLUMBING. ROUGH WINDS THAT ARE TAKING

PLACE AT THAT CAMPUS. >> AND ROBIN, IF YOU WANT TO JUST JUMP EASIEST TO THE RIVER RAGING AT ME. I THINK THAT WILL HELP US MOVE THIS THROUGH A LITTLE SMOOTHER.

IS THAT WHAT THAT WAS? ARE THE VIDEOS CORRECT? THAT WAS THE FOUR VIDEOS FOR A

RIVER. >> AND THERE'S JUST ONE VIDEO FOR RIVER RIDGE ACADEMY.

OK. >> THERE IS RIGHT OUT THERE ON THE RIGHT.

>> YOU SEE THE EXISTING GYMNASIUM AS THEY'RE PANNING ACROSS.

YOU'LL SEE THAT THE EXTERIOR 400 WING THERE ON THE LEFT EXTERIOR BRICKWORKS I'LL FINISH DAY AND WE'RE ACTUALLY BEGINNING TO PREPARE FOR INSTALLATION LANDSCAPING.

THIS IS THE INTERIOR CORRIDOR OF THE FOUR HUNDRED. YOU'LL SEE ALL THE CEILINGS HAVE BEEN INSTALLED. THE FLOORS BEEN PLACED AS WELL. WE'RE NOW MOVING INTO A TYPICAL CLASSROOM IN THAT FOUR HUNDRED WING WHERE YOU'LL SEE CASEWORK IS STARTING TO ARRIVE AS WELL AS BEING INSTALLED AND THIS IS SOME OF THE BATHROOM COMMON SPACE BETWEEN THE TWO CLASSROOMS AS WELL AS THE WATER FOUNTAINS THERE. THIS RIGHT HERE IS THE 800 WING THE EXTERIOR WING EXTRA BRICKWORKS FINISHED THERE AND ONCE AGAIN THE PROGRESS THAT'S BEING MADE ON THE INSIDE WITH RELATED RELATED TO THE TRADE WORK.

AND THIS LAST PORTION OF THE VIDEO SHOWS SOME OF THE WORK THAT'S TAKING PLACE BETWEEN THE 700 WING THAT'S EXISTING AND THE TRANSITION TO THE EIGHT HUNDRED WAY.

YOU DID NOT SEE A VIDEO INCLUDED IN THIS LITTLE TOUR TODAY ASSOCIATED WITH THE 600 WING. BUT ONCE AGAIN THE PROGRESS OF THE 600 WING IS JUST A MIRROR IMAGE OF WHAT YOU JUST SAW FOR THE FOUR HUNDRED WAY. IF WE COULD CONTINUE TO KEEP THIS MOVING ALONG, ROBIN, WE'LL GO TO THE POWER POINT AND IF YOU'LL GET THIS, WHY? NUMBER FOUR? OK, I'LL DOVE INTO THE REMAINING UPDATES FOR ME.

RIVER HIGH SCHOOL. ALL RIGHT. >> LET ME GET TO NEEDED

CONSTRUCTION. >> I'M SORRY. PUT IT THE WRONG THING IN TO

CONSTRUCTION. GIVE ME A MOMENT. >> YES, I'M HAVING TECHNICAL DIFFICULTIES AT THE MOMENT. GIVE ME A MOMENT. LET ME GO BACK TO SHARING.

I GOT TO SLIDE FOR. YES, PLEASE. ALL RIGHT.

>> MEAN SO ONCE AGAIN PROVIDED THE UPDATE FROM A RIVER HIGH SCHOOL.

THE PROJECT IS UNDER BUDGET AND REMAINING ON SCHEDULE. BOTH INDICATED BY THE GREEN TRAFFIC LIGHTS THAT THIS PROJECT WAS FUNDED FROM THE 2019 REFERENDUM AND THE RECAP THERE IS THE BUDGETED FUNDING FOR THE ADDITION JUST OVER FIFTEEN POINT SIX MILLION AND

[00:10:02]

UPDATED FIGURES THERE AT THE BOTTOM FOR ENCUMBERED AND PAID TO DATE AS WELL AS THE FIGURE OF FOUR POINT FOUR MILLION PAID TO DATE ON THIS PROJECT ACTIVITIES ON THE FORTY FIVE

DAY MILESTONE LOOK AHEAD. >> CONTRACTOR CONTINUES TO TAKE ADVANTAGE OF WORK WEEKENDS WHICH IS EXCELLENT TO SEE WHAT YOU'LL SEE THERE ARE ACTIVITIES FOR THIS COMING WEEKEND WRAPPING UP MASONRY WORK AS WELL. CLEANING UP THE SITE AS WELL AS THE OTHER ACTIVITIES THAT ARE SHOWN THERE FOR THOSE ACTIVITIES THAT ARE TAKING PLACE. BIG FOCUS THAT I'D POINT OUT THERE IS THAT WE DO HAVE OUR OSHA FIRST FLOOR OVERHEAD INSPECTION AND SECOND FLOOR OR READ INSPECTIONS CURRENTLY SCHEDULED TO TAKE PLACE ON SEPTEMBER 22ND AND OCTOBER 15TH RESPECTIVELY AND WE CONTINUE TO HAVE A GREAT REPERTOIRE WITH OSA AFTER YOU HAVE BEEN ACCOMPLISHING OS F INSPECTIONS THROUGH THE COURSE THE LAST MONTH. WE ACTUALLY UTILIZED A VIRTUAL OS INSPECTION AT ONE OF THE PROJECT SITES WHICH I BELIEVE MAY HAVE BEEN THE FIRST IN THE STATE. THAT WAS VERY SUCCESSFUL LAST WEEK.

I'LL PAUSE RIGHT THERE TO SEE IF THERE'S ANY QUESTIONS RELATED TO THE MAY RIVER HIGH

SCHOOL. >> I DON'T SEE ANY HANDS BUT MOVING RIGHT ALONG I KNOW YOU

YOU GENTLEMEN HAVE A VERY FULL AGENDA THIS AFTERNOON. >> SO IN THE INTEREST OF TIME I'LL KEEP IT GOING. WE'VE ALREADY SEEN THE VIDEOS AT RIVER RIDGE ACADEMY AS INDICATED BY THE TRAFFIC LIGHTS. WE DO HAVE A PROJECT THAT IS UNDER BUDGET AND ON SCHEDULE FUNDED FROM THAT 20 19 REFERENDUM TOTAL BUDGETED FUNDS FOR THE ADDITIONS AT RIVER RIDGE NINE POINT EIGHT MILLION ENCUMBERED AND PAID TO DATE FIGURED THEY ARE SHOWN AND THEN ARE PAID TO DATE FIGURE OF JUST OVER FOUR POINT SIX MILLION DOLLARS AND THERE'S SOME MORE REPRESENTATIVE PHOTOS THERE THAT WILL SHOW THE PROGRESS IS TAKING PLACE THERE AT RIVER RIDGE. THE FORTY FIVE DAY LOOK AHEAD.

SAME CONTRACTOR DOING THIS PROJECT AS MAY RIVER ITS M.B. KHAN.

JUST LIKE AT THE MAY RIVER SITE THEY ARE TAKING FULL ADVANTAGE OF WORK AND WEEKENDS.

THIS WEEKEND'S ACTIVITY IS GOING TO BE FOCUSED ON PULLING ELECTRICAL WIRE AND WE ARE SEEING FURNITURE DELIVERY TAKE PLACE IN THE FOUR HUNDRED AND SIX WINGS OVER THE COURSE OF THE PAST FEW DAYS AS I MENTIONED, WE'RE GOING TO BE LOOKING AT THE ELECTRICAL TRANSITION AND GETTING THAT WRAPPED UP BY THE END OF AUGUST 15TH.

AND WE DO HAVE THE CASEWORK INSTALLATION THAT HAS COMMENCED NOW OUT THERE IN THE FOUR HUNDRED SIX HUNDRED WINGS THAT SHOULD BE WRAPPING UP BY THE END OF AUGUST AND OUR FURNITURE DELIVERY FOR THE EIGHT WING IS SCHEDULED TO TAKE PLACE SEPTEMBER 2ND.

>> ANY QUESTIONS RELATED TO REVERENTIAL ACADEMY CAUSING HEARING NONE OR SAYING ANY HANDS WILL MOVE RIGHT ALONG ROBIN GO INTO OUR SUMMER 2020 ROOFING PROJECT UPDATES TO

BEGIN WITH. >> THESE ARE PROJECTS THAT ONCE AGAIN ARE FUNDED FROM THE 8 PERCENT CAPITAL PROJECT FUNDS. WE DO NOW HAVE THE ROOF REPAIRS BEING REPORTED AS COMPLETED AT BLUFFTON MIDDLE SCHOOL AND OVER AT THE BLUFFTON ELEMENTARY. THE COMPLETION OF THE WORK IS SCHEDULED TO ■TAKEPLACE THIS&-PO

* This transcript was compiled from uncorrected Closed Captioning.